Spraying equipment manufacturers have the following requirements for the work site

Column:Industry News Time:2018-03-08
Any process that uses toxic, irritating and flammable substances should be placed in a separate factory building

   Spraying equipment manufacturers have the following requirements for the work site, let's take a look:

   1. All processes that use toxic, irritating and flammable substances should be placed in a separate factory building or organized in a specially isolated section in the factory building and equipped with personal protective equipment and fire fighting equipment.

   2. The aisles in the workshop should be equipped with facilities to eliminate the wind through the hall, and the facilities to avoid the spread of fire such as automatic fire doors, fire and smoke baffles, water curtains, etc.

   3. When the spraying equipment manufacturer needs to reach the operation position above the equipment safely, it should install a flyover with protective railings and stairs. The non-slip ground shall be laid on the ground of the factory building and the overpass.

   Fourth, there should be no stacking equipment, objects and wires on the pedestrian passage, and the width of the passage should not be less than 1m.

   Fifth, it is necessary to lay a protective net under the assembly line walking above the work area to avoid falling objects.

   Sixth, excess paint and waste paint, etc., should be isolated and stacked in a dedicated paint warehouse.